Option (nur Gedanken-Spiele):
a. Irgendwie doch noch bei der Schlussbremse
b. oder Ausfahrt Station (aus ästhetischen Gründen aus dem Trailer und Animation weg gelassen)
c. Hebestation wie Macks Family- und Spinning-Coaster
d. Beginn Launch 2 im Berg, da ist nämlich viel Platz drin und könnte neben der ART-Bahn sein. Praktische Logistik und ein Abschuss mit 1. leicht-Rückwärts-Launch und dann voll Vorwärts müsste für die Blockzonen eh programmiert werden. So könnte man die Züge unten im Berg lagern und warten und bei Bedarf in die Strecke schießen.
Ich hoffe auf Variante d. - wenn Canadas Wonderland was kann, dann ihre Techniker gut nutzen.
Technical
Transfer track not being seen in the animation wasn't a fluke; it will be located inside the mountain. Indoor section will be partially but not fully enclosed. Coaster height extends roughly 75 feet above the exit point on top of the mountain. That funny floating support in the animation will be connected to the ground irl. They want this thing doing 1,000+ pph, which means 60 dispatches per hour. Absolutely ludicrous figure but we'll see how it goes.
Trains
Lapbar only, no comfort collars or seatbelts. As shown in the animation, the triangular sides have been removed at the park's request, partially for aesthetics and partially to ease load/unload. That's right, Premier Rides is at last making some kind of effort to improve the Sky Rocket train, although I wouldn't expect any further design fixes.
Loose Articles
They don't want to install netting around the coaster, so expect an incredibly strict loose articles policy. They'll be using a combination of metal detectors and the fancy flying bins system seen on Yukon Striker and WMG, although logistics aren't fully figured out yet.
Station
Most of the queue at least should be below the station. Fast Lane and Standby will merge before the stairs, single rider's line will go to the top. Pretty much the setup currently being tested out on Behemoth. Platform will have room to park both trains inside (don't expect an unload). Floor will fold away during dispatch, not sure why it's strictly necessary but eh.
Other
Yes they did talk to B&M about a layout. Peter Switzer (maintenance) has gone golfing with them plenty, too.